Kinley

5/4/16 We set up the blog, got our jobs, figured out if we were going to miss any days, and got an overview of everything.

5/6/16 Our groups worked on The Challenge page, and what is an ROV. I worked on the third paragraph of the what is an ROV page.

5/10/16 Did interview, watched videos on instructions, started marking the pvc pipes.

5/11/16 I finished cutting the pvc pipes and drilled holes in both the elbows and two five inch and one 4.5 inch pipes. Also made the holes for the thrusters.

5/13/16 I finished building the base of the ROV and did the daily log for the group.

5/19/16 Helped put turbine on the ROV, started to memorize the fishes

5/20/16 Helped put on the accessories and tested the ROV in picking up both the oil cap and octopus

1 comment:

  1. Please check the "absent" tab to find out what to do when you miss class. thanks!

    ReplyDelete