5/4/16 We set up the blog, got our jobs, figured out if we were going to miss any days, and got an overview of everything.
5/6/16 Our groups worked on The Challenge page, and what is an ROV. I worked on the third paragraph of the what is an ROV page.
5/10/16 Did interview, watched videos on instructions, started marking the pvc pipes.
5/11/16 I finished cutting the pvc pipes and drilled holes in both the elbows and two five inch and one 4.5 inch pipes. Also made the holes for the thrusters.
5/13/16 I finished building the base of the ROV and did the daily log for the group.
5/19/16 Helped put turbine on the ROV, started to memorize the fishes
5/20/16 Helped put on the accessories and tested the ROV in picking up both the oil cap and octopus
Please check the "absent" tab to find out what to do when you miss class. thanks!
ReplyDelete